Term:

SIMULTANEOUS (PARALLEL) DEPENDENT APPROACHES

Meaning: An approach operation permitting ILS/RNAV/GLS approaches to adjacent parallel runways where prescribed diagonal spacing must be maintained. Aircraft are not permitted to pass each other during simultaneous dependent operations. Integral parts of a total system ATC procedures, and appropriate airborne and ground based equipment.
Previous Term: SIMULTANEOUS OFFSET INSTRUMENT APPROACH (SOIA)
Next Term: SINGLE DIRECTION ROUTES