Term:

LOST LINK PROCEDURE

Meaning: Preprogrammed or predetermined mitigations to ensure the continued safe operation of the UA in the event of a lost link (LL). In the event positive link cannot be established, flight termination must be implemented.
Previous Term: LOST LINK (LL)
Next Term: LOW ALTITUDE AIRWAY STRUCTURE